|
1. Which team of healthcare professionals provides pre-hospital emergency care? (p. 4) Correct-Emergency Medical Services Wrong-Emergency Transportation Services Wrong-Emergency Health Services Wrong-Emergency Rescue Services
2. Which level of EMT has extensive training in the area of cardiac monitoring and pharmacology? (p. 4) Correct-EMT-Paramedic (EMT-P) Wrong-EMT-Basic (EMT-B) Wrong-EMT-Intermediate (EMT-I) Wrong-EMT-Transport (EMT-T)
3. What is covered in the most important category of EMT-Basic training? (p. 5) Correct-Taking care of life-threatening conditions Wrong-Taking care to prevent further harm Wrong-Taking care when providing basic emergency care Wrong-Taking care when responding to the scene
4. Which item is part of the training for preventative care of a patient before he is moved? (p. 6) Correct-Splint injured extremities Wrong-Establish an open airway Wrong-Provide adequate ventilation Wrong-Recognize and treat shock 5. Which is NOT considered a general requirement to be able to perform EMT-B duties? (p. 6) Correct-College degree in medicine Wrong-Valid driver's license Wrong-Proof of immunization Wrong-Meet mental criteria
6. ac, accelerate, acreage, be, bean, bear, can… a. cat, car b. ceiling, canopy c. cantaloupe, capacity d. carrot, canoe First entry sets the stage for the other words. Then the words start with those two letters and are in alphabetical order. 7. AB YZ CD WX EF a. UV GH OP IJ b. QR KL MN ST c. OP GH KL ST d. UV JK NO AB First two letters then last two letters. Follows this pattern towards the center of the alphabet.
8. A B C D
First star has 8 points. Next 8*2=16 points Then 8*3=24 points Finally 8*4=32 points
9. A paper company makes three different types of paper. These include typing, printer and lined paper. They make 3,000 pounds of lined paper an hour. They make twice as much typing paper as lined and three times as much printer paper as typing. How much printer paper do they produce in an 8 hour day?
a. 144,000 pounds b. 18,000 pounds c. 160,000 pounds d. 32,000 pounds 3000=lined 2*3000=6000 typing 3*6000=18000 printer per hour 18000*8=144000 printer in 8 hours 10. Which is an extra step that is needed when a trauma is suspected when using the bag-valve-mask? (mod 2 (refresher) III.C.4.(b))
|